Customization: | Available |
---|---|
After-sales Service: | Online Service |
Warranty: | 1 Year Warranty |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
PH | 6--8 | B\C | ≥0.3 |
Inflow suspended solids | ≤1500mg\L | Influent ammonia nitrogen concentration | ≤2000mg/L |
Effective water depth | 5-8m | COD concentration of influent water | ≥1500mg/L |
Effective water depth | <0.8m/h | UASB sludge yield | 0.05-0.10kgVSS/kgCOD |
Total depth of sedimentation zone | ≥1.0m | Sedimentation zone surface load | ≤0.8m |
The distance between the perforated water pipe and the pool bottom | 200mm | Outlet weir load | 6.12m/(h·m) |
Use for | Mineral, Printing, Chemical, Dyeing, Starch | Certificate | SGS, ISO |
The biodegradation of the IC reactor is divided into two stages. The first reaction zone at the bottom is at high load, and the second reaction zone at the top is at low load. The influent enters the first reaction zone from the bottom and is fully mixed with anaerobic activated sludge. Most of the organic matter is degraded into biogas in this zone, and the generated biogas is collected by the gas collection hood of the three-phase separator and rises along the biogas riser, At the same time as it rises, it also lifts the mixed liquid in the first reaction zone to the gas-liquid separator at the top.